All Content from Business Insider 10月07日
OpenAI携手AMD,AI算力需求激增引发电力挑战
index_new5.html
../../../zaker_core/zaker_tpl_static/wap/tpl_guoji1.html

 

人工智能的飞速发展正对全球电力供应构成严峻挑战。OpenAI近期接连与AMD和Nvidia签署了价值数十亿美元的巨额芯片采购协议,分别采购6吉瓦和10吉瓦的AI算力。这凸显了AI竞赛背后对计算资源和电力供应的巨大需求。美国电网已不堪重负,预计到本十年末需要新增约60吉瓦的电力供应。面对公共电力基础设施的瓶颈,包括OpenAI在内的科技公司正寻求自建发电设施,以确保AI发展的能源供给。例如,OpenAI已在德克萨斯州的数据中心采用天然气发电,而埃隆·马斯克也为xAI数据中心配置了移动式天然气涡轮机。

⚡️ **AI算力需求爆炸式增长,引发能源危机警报**:OpenAI近期与AMD达成6吉瓦,与Nvidia达成10吉瓦的巨额芯片采购协议,充分表明了AI技术发展对计算能力的需求已达到前所未有的水平。这种对算力的渴求正在以前所未有的速度消耗电力资源,预示着AI竞赛的背后隐藏着一场潜在的能源危机。

💡 **美国电网承压,电力供应缺口巨大**:美国电力公司正面临严峻挑战,预计到2030年需要新增约60吉瓦的电力供应,这相当于数个大型城市的总用电量。AI数据中心的快速扩张,特别是对高性能计算芯片的巨大需求,正以前所未有的速度消耗着现有的电力基础设施,使得电网接近极限。

🔌 **数据中心寻求能源自主,自建发电成趋势**:为了应对公共电力供应的瓶颈和不确定性,OpenAI等科技公司正积极探索能源自主解决方案。OpenAI已通过在德克萨斯州的数据中心部署现场天然气发电厂来保障能源供应,而埃隆·马斯克的公司也在为xAI数据中心配备移动式天然气涡轮机,显示出行业正在转向自建发电设施以确保AI发展的能源安全。

🤝 **AMD与OpenAI的战略合作及激励机制**:OpenAI与AMD的五年协议不仅是算力供应的合作,更包含了一套激励机制。OpenAI将获得高达1.6亿股AMD股票期权,约占AMD公司总股本的1%。这些期权将根据部署的吉瓦数分批授予,旨在鼓励双方加速合作进程,预计首批1吉瓦算力将于2026年下半年投入使用,而全部6吉瓦的部署时间将取决于双方获取足够能源的能力。

OpenAI CEO Sam Altman and AMD CEO Lisa Su

If OpenAI wants to win the AI race, it may need to bring its own power supply.

The ChatGPT maker has signed a multibillion-dollar partnership deal with AMD to deploy 6 gigawatts of the semiconductor company's artificial intelligence chips. Just last week, OpenAI and chip designer Nvidia announced a deal for 10 gigawatts of computing power.

OpenAI has said that it desperately needs access to more compute in order to realize its ambitious growth strategy, but its recent chip deals have begotten another crucial need: more power.

In the US, the AI race has strained the electric grid to a near-breaking point. Utilities are reporting the need for about 60 gigawatts of new power, or six large cities' worth, by the end of the decade. It can take years of planning and regulatory hearings for power companies to bring new infrastructure online.

With the rapid pace of new chip announcements, experts say it is becoming increasingly necessary for data centers to bypass public utilities and start providing their own power.

"The industry in general has known for years now that we're bumping up against grid capacity," said Sean Farney, vice president of data center strategy for the Americas at Jones Lang Lasalle. "To win in this game, they need to be innovative and release these self-generating solutions."

OpenAI is already supplying its data center in Abilene, Texas, part of the Stargate project, with power via an on-site natural gas plant.

Elon Musk is providing power to an xAI data center in Memphis with mobile natural gas turbines and has purchased the site of a former gas plant in Mississippi.

A spokesperson for AMD confirmed the 6 gigawatts of compute announced Monday is incremental to what OpenAI has previously announced. OpenAI did not respond to a request for comment.

The five-year deal is structured to incentivize both companies to perform. OpenAI will receive warrants for up to 160 million AMD shares, or about 1% of the company, with groups of shares awarded for each gigawatt deployed.

The first gigawatt is expected to start coming online in the second half of 2026, AMD CEO Lisa Su said Monday on a conference call with investors.

She added that the timeline for deploying all 6 gigawatts will depend on when and how OpenAI and AMD can access enough power.

"The idea would be to deploy as soon as we can, " said Su.

Read the original article on Business Insider

Fish AI Reader

Fish AI Reader

AI辅助创作,多种专业模板,深度分析,高质量内容生成。从观点提取到深度思考,FishAI为您提供全方位的创作支持。新版本引入自定义参数,让您的创作更加个性化和精准。

FishAI

FishAI

鱼阅,AI 时代的下一个智能信息助手,助你摆脱信息焦虑

联系邮箱 441953276@qq.com

相关标签

OpenAI AMD Nvidia AI算力 电力供应 数据中心 能源危机 AI Compute Power Grid Data Centers Energy Crisis
相关文章