taiyangnews 08月07日
Arevon Launches One Of US’ Largest Solar-Storage Projects
index_new5.html
../../../zaker_core/zaker_tpl_static/wap/tpl_guoji1.html

 

Arevon Energy开发的Eland太阳能储能项目在加州莫哈韦附近全面运营,将满足洛杉矶7%的电力需求,提升洛杉矶清洁能源比例至60%以上。

The Eland Solar-plus-Storage Project, developed by Arevon Energy, is now fully operational near Mojave, California. As one of the largest solar-storage sites in the US, it will help meet 7% of Los Angeles’ electricity demand.

Los Angeles Mayor Karen Bass said the project will increase the city’s clean energy share to more than 60%.

Completed in 2 phases, Eland 1 and 2, the project has a total nameplate capacity of 758 MW DC of solar with 300 MW/1,200 MWh of co-located energy storage capacity. Together, the 2 facilities are equipped with 1.36 million solar panels and 172 lithium iron phosphate (LFP) batteries. 

Arevon says the LFP batteries, which are known to have ‘no reported fire incidents’ since their commercial use from 2019, were manufactured locally.

“The batteries, which were manufactured locally in Lathrop, California, efficiently and quickly discharge power during times of peak demand, strengthening California’s energy security, especially in the face of extreme heat, brownouts, and blackouts,” stated Arevon.  

Power generated and stored by the Eland project is contracted under long-term agreements with Southern California Public Power Authority (SCPPA) to deliver to its members, Los Angeles Department of Water and Power (LADWP), and Glendale Water and Power (GWP).

Arevon added that the project created close to 1,000 jobs to construct the facility. It is expected to pay more than $36 million to the local government throughout its lifetime, which will be used for schools, public services, and other uses.

Fish AI Reader

Fish AI Reader

AI辅助创作,多种专业模板,深度分析,高质量内容生成。从观点提取到深度思考,FishAI为您提供全方位的创作支持。新版本引入自定义参数,让您的创作更加个性化和精准。

FishAI

FishAI

鱼阅,AI 时代的下一个智能信息助手,助你摆脱信息焦虑

联系邮箱 441953276@qq.com

相关标签

太阳能储能 Arevon Energy 洛杉矶电力需求
相关文章